Work Log

Date Description of work performed Hours worked Day's/
Hours
Photos / Notes
atHome Powerplant Other
2015-08-31 ordered some alu-samples, for stability tests of the edge-connectors...
3 3 plywood
2015-09-09 finished with maindesign of the alu-frame parts
200 200
2015-09-09 webpage creation of "ultinurmi II"
5 5 rendered printer image
2015-11-00 assembled the dxf for laser cutting...
30 0 0 30
2015-12-03 cut plexi with laser
corrected the alignment of the laser engraver (angle, height)
3 3
2015-12-04 cut plexi with laser
2 2
2015-12-06 screwed all frame parts
5 5
2015-12-07 designed and printed some spacers, brims, caps for the ballbearings...
screwed the ballbearings together
2 2 0 4
2016-06-09 entgraten aller Laserteile
3 6 9 lukas, kurt
2016-06-10 zSpindles on lathe, zNuts un lathe, cut the rods
4 4 8 kurt
2016-06-11 Pulleys, belt tensioner
vac-holes
zBeltTensioner
frame assembled
bed heating system
10 11 21 kurt
2016-06-13 modified and printed the bottomBallbearingDustBrim
created some plans (zSpindlePlan, zNutPlan)
7 1 8
2016-06-14 bearingXCapSpacer printed
modification of the slider
6 1 7
2016-06-15 slider, sliderFixer created
sliderFixer printed
7 1 8
2016-06-17 bed fittings with cu-silicone glued
2 2 4
2016-06-18 designed and printed the heaterSpringHolder
ordered some tools...
4.5 1 5.5
2016-06-21 print belt tensioner for gt2
created "6_tools.sh" script
3 1 4
2016-06-22 design of the endstops
ordered some electronics
12 12
2016-06-23 modified the heaterSpringHolder
1 1
2016-07-25 glued the termo sensors into the bed
4 1 5
2016-07-26 designed cableChains
printed cableChain parts
1 3 4
2016-07-27 lathe one more zNut
glued zNutHolder
.5 1.5 2
2016-07-29 glued bed together
glued bearings onto bed
4 4
2016-08-06 assembled the head
screwed all rods together
7 7
2016-08-06 created the headStencil
1 1
2016-08-07 soldered the endstops,
mount the endstops
.5 2.5 3
2016-08-07 check z-belt tension
1 1
2016-08-08 create webfrontent with raspi (octoprint)
5 1 6
2016-08-10 print the cable chain and clips
designed the outputChain
print the footStopper
assempled all the cable chains + footStopper
2.5 2 4.5
2016-08-10 assemple the xy-belts
.5 1.5 2
2016-08-10 calibrate/adjust xy-belt tension
1 1
2016-08-15 print 9 pieces of the cable clips, cleaned them
1 1
2016-08-15 solder the gen8
flashed the mcu
5 5
2016-08-29 solder some cable connectors for the mainboard
2 2
2016-08-30 finished the psu ground-decoupling
2 2
2016-08-31 created a raspberryPI with octoprint
4 8 12
2016-09-01 create wooden electronic holder plate
print second psu-holder
5 .5 5.5
2016-09-02 create clamps for wooden electronic holder plate
2 .5 2.5
2016-09-03 assembled the plate holder
.5 1.5 2
2016-09-05 some cable manufactured
ground shielded the stepper wires
200mm micro usb connector for raspi
450mm cable for psu-wakeup
500mm extension cable for 2 steppers
.5 3.0 3.5
2016-09-07 modified cable clip model
1 1
2016-09-08 new enlarged psu hinge...
1 .5 1.5
2016-09-12 printed four cable clips
mount tube incl. clamps for stepper cables
mount tube incl. clamps for endstop cables
1.5 1.5
2016-09-22 printed new sliderFixer
.5 0.5
I confirm that the information on the forms are true. Page total
 
my_signature 
amount ...
Builders signature Total to date 312.5 84.5 23 420

top Spenden Creative Commons License open source vim linux ssl labs prooved Valid XHTML 1.0 Transitional hacker emblem